Building for Mission

On Sunday, January 14, First Lutheran voted to authorize construction drawings and solicitation of bids for “Phase 1” of our master plan, which includes construction of a two-story addition housing an elevator, open staircase, gathering areas on both levels, and a new entrance into our sanctuary. Phase 1 also includes renovation of main floor restrooms and the addition of an accessible restroom on the ground floor, replacement of our boiler, and deferred maintenance and reconfiguration of our air conditioning system.

We are excited about making our building more welcoming, accessible and comfortable for the Carlisle community and all who gather here for worship, musical performances, education, fellowship and care!

To see a summary of the master plan and work encompassed in each phase, click here:

Jan 2018 BFM master plan overview

 

Pictured above – Don Main and Tim Cryer of Marotta/Main architects presenting the master plan to the congregation on Sunday, January 7.

 

 

 

 

Comments are closed.